Eau Gallie Yacht Club Aquatics pool — Indian Harbour Beach, FL
Grunit Editorial

EauGallie Yacht Club Aquatics

Indian Harbour Beach, FL
Case Study: Commercial
Scroll to Explore
The Vision
01
“Reimagine an established waterfront pool as a renewed, family-focused aquatics destination.”
— Commercial Project Brief

The Brief

Eau Gallie Yacht Club asked Grunit to modernize its existing commercial aquatics environment in Indian Harbour Beach. The assignment combined a full pool remodel and redesign with the addition of a separate children’s splash pad.

The finished setting had to work as one cohesive club amenity: a renewed heated pool, a durable deck environment, and water play for younger members, all integrated into the architecture and marina-facing landscape of a historic private club.

Full RemodelExisting Aquatics
Splash PadFamily-Focused Addition
Heated PoolRenewed Club Amenity
WaterfrontIndian Harbour Beach
What did Grunit remodel at Eau Gallie Yacht Club?

Grunit completed a full remodel and redesign of the commercial aquatics area, renewing the main pool environment and adding a dedicated children’s splash pad.

Does the Eau Gallie Yacht Club aquatics area include a splash pad?

Yes. The completed family-focused amenity includes a separate splash pad with interactive spray features beside the renovated pool.

Where is the Eau Gallie Yacht Club pool project?

The project is at 100 Datura Drive in Indian Harbour Beach, Florida, on the club’s waterfront property near the Banana River and Intracoastal Waterway.

Can an existing commercial pool be redesigned without building an entirely new facility?

Yes. This project shows how an established pool environment can be reworked as a coordinated remodel, including refreshed pool and deck areas plus a new complementary water-play amenity.

02

The Facility

A renewed pool, family splash pad, and waterfront club setting documented from the deck and the air.

Aerial overview of the completed Eau Gallie Yacht Club aquatics remodel
Renovated yacht club pool and deck viewed from above the marina
Eau Gallie Yacht Club clubhouse, pool, and waterfront grounds
Close view of the renewed pool edge and deck finishes
Wide view across the pool toward the children’s play area
Completed children’s splash pad beside the remodeled pool
Facility Views
03
The Result Built

A Reimagined Waterfront Amenity

The completed remodel gives Eau Gallie Yacht Club a cohesive aquatics destination for multiple generations. The main pool and surrounding deck read as a refreshed waterfront amenity, while the new splash pad creates a distinct place for younger children without separating families from the larger pool environment.

Planning a commercial aquatic project?

Start with a project-specific consultation for new construction or renovation.

Discuss Your Project →

Commercial consultation · Site-specific planning · Project-specific scope