Grunit’s Before the Dig Guide

BEFORE
THE DIG

See what happens before the first shovel hits the ground.

See what is happening

01 · Set expectations

Behind the scenes

WHY CAN IT FEEL LIKE
NOTHING IS HAPPENING?

Because most pre-construction work happens somewhere other than your backyard.

A pool designer and engineer collaborating over illuminated plans, a pool concept, and finish samples
Behind the scenesTechnical planning turns a design into buildable instructions.
At the designer’s deskInside engineering plansAt the permitting officeWith your HOA committeeThrough property researchIn ordering and scheduling
A quiet backyard does not necessarily mean an inactive project.

The purpose of this stage is to replace assumptions with confirmed plans before excavation makes changes much more expensive.

Project pathWhat happens next?
01 / 07
Contract signed

The vision, scope, and working relationship are established. Detailed planning can now begin.

02 · Common variables

Keep perspective

WHAT CAN SLOW
THE PROCESS DOWN?

Not every delay is a sign that something has gone wrong. What matters is whether the builder can explain the current stage, what is outstanding, and what happens next.

Pool finish, tile, coping, decking, and water color material selections
Selections matterLate or special-order materials can affect the schedule.
01Design changes

Changes made after engineering or permitting begins may require updated plans, revised pricing, or resubmission.

02Missing property documents

An outdated or unavailable survey can delay accurate planning or permit submission.

03HOA review

HOA approval operates independently from municipal permitting and may follow its own meeting schedule.

04Permit corrections

A reviewing agency may request clarification or revisions before approving the plans.

05Special site conditions

Limited access, drainage, elevation changes, utilities, septic systems, easements, or protected areas may require additional planning.

06Material availability

Special-order finishes or equipment can affect scheduling, particularly if selections are made late.

07Weather

Heavy rain and severe weather can affect excavation schedules and the projects ahead of yours.

03 · Your action list

What you can do

YOUR PRE-CONSTRUCTION
READINESS CHECKLIST.

Complete what you can now. Your progress is saved on this device for your next visit.

0/ 7
A clear place to begin.

04 · Better conversations

Questions worth asking

CLARITY SHOULD NEVER
FEEL DIFFICULT TO ASK FOR.

A good builder should be able to explain the process without making you feel difficult for asking. Select a card to reveal why the question matters.

Homeowners reviewing pool plans and material selections with a pool professional beside their marked backyard site
Clear communicationThe questions you ask before construction support better coordination once work begins.
A finished custom pool and outdoor living space at twilight

Ready when you are

LET’S TALK ABOUT
YOUR BACKYARD.

Get a free project quote, or choose a time for a planning call with the Grunit team.

Get a free quote
Book a free call(407) 837-9204
Clear answers about scope, timing and what is possible.