How We Build

Our Process

Every Grunit pool follows the same engineered path — a transparent, step-by-step build that protects your investment from first sketch to first swim.

Start Your Project

  1. 01
    Step 01

    Layout

    We stake the approved design directly on your property — marking the exact footprint, depth, and elevations — and pass the preliminary excavation inspection before a shovel hits the ground.

    • Site staking
    • Footprint & elevations
    • Excavation inspection
  2. 02
    Step 02

    Dig

    Excavation crews carve out the pool to precise specification — shaping the floor, walls, steps, and benches — while managing haul-off and site access.

    • Shape & depth
    • Steps & benches
    • Haul-off
  3. 03
    Step 03

    Steel

    A hand-tied rebar cage is built throughout the shell and electrically bonded to code — the steel skeleton that gives your pool its structural strength.

    • Rebar cage
    • Steel bonding
    • Pool steel inspection
  4. 04
    Step 04

    Pre-Plumbing

    Main drains, jets, and feature plumbing are roughed in through the shell — everything that will live under concrete — then every line is pressure-tested and inspected before a single yard of concrete is poured.

    • Main drains & jets
    • Feature lines
    • Pressure test & inspection
  5. 05
    Step 05

    Gunite

    Pressure-applied gunite is sprayed over the steel to form the monolithic concrete shell — the structural heart of the pool — then moisture-cured toward its full design strength.

    • Shotcrete shell
    • Steps & spa
    • 28-day cure
  6. 06
    Step 06

    Plumbing

    The full plumbing system — skimmers included — is assembled and pressure-tested, with underground electrical runs set — verified by pipe-pressure and underground inspections.

    • Skimmers
    • Pressure test
    • Underground electrical
  7. 07
    Step 07

    Close Trenches & Bonding

    Trenches are backfilled and the equipotential bonding grid is completed and grounded — a critical safety step that ties all metal to a common electrical ground.

    • Backfill
    • Bonding grid
    • Grounding inspection
  8. 08
    Step 08

    Tile & Coping

    Waterline tile and coping stone are set by hand, defining the pool’s edge, the spa, and the first real glimpse of its finished character.

    • Waterline tile
    • Coping stone
    • Spa spillway
  9. 09
    Step 09

    Footer and/or Retaining Wall

    If your design calls for them, structural footers, curbs, and retaining walls are poured — engineered and inspected — so the deck and surroundings are fully supported.

    • If applicable per design
    • Curbs & retaining walls
    • Engineered & inspected
  10. 10
    Step 10

    Deck & Equipment

    Pavers, travertine, or poured decking go down and the equipment pad is set — pumps, filter, heater, and automation installed, with your choice of chlorination system: salt, chlorine, or solar.

    • Pavers & travertine
    • Pumps, filter & heater
    • Salt / chlorine / solar
  11. 11
    Step 11

    Electrical

    Final electrical connections are made and safety-tested — equipment, lighting, and automation energized and verified to code.

    • Equipment wiring
    • LED lighting
    • Safety inspection
  12. 12
    Step 12

    Interior Finish & Waterproofing

    You choose the interior finish — quartz and mini pebble are two of the handful of options we offer — and it’s applied by hand to seal the shell watertight. Then the pool is filled, the water is balanced, and we pass final inspection. Time for your first swim.

    • Quartz / mini pebble
    • Fill & balance
    • Final inspection